Lift

Materials

Quantities below are for one lift. Use the with-lift BOM for the allocated fasteners; shared base parts are reused.

PartQuantityNotes
MISUMI HFS8-80160-1170-TPW mast1Guide-seat machining required.
Steel cradle1Custom fabrication.
HIWIN HGR20 rails, 1120 mm2Keep guide blocks on rails or transfer retainers.
HIWIN HGH20CA blocks4Two per rail.
Carriage1Current guide seats and cam holes; custom fabrication.
MISUMI BSSRK2020-1100-F36-P12 screw and ballnut1 setKeep ballnut on screw.
BNFA2020R-25 ballnut bracket1Use allocated flange hardware.
Fixed/floating supports and bearing adapters1 setCustom adapters need final drawings.
Kraken X601Fifth purchased motor; four belong to the base.
REV MAXPlanetary base, brake, 3:1 cartridge, input coupler1 eachSplineXS input.
Machined output shaft1Custom fabrication.
Ruland MJC33-12-A hubs2One at each shaft.
Ruland JD21/33-98R spider1Between the two hubs.
HFS8-4080-710 arm beam and HBLUQ8 support1 eachSilver/clear anodized.
YAM Ultra arms2Add after checking unloaded lift travel.
Limit switches, mast brackets and moving cam2 switches, 2 brackets, 1 camUse the BOM hardware allocation.
D435i, printed mast bracket and end cap1 eachCamera hardware below.
End-stop hardwareSee BOMMounting arrangement remains under review.

Tools

ToolNotes
Metric and imperial hex toolsReuse the existing sets.
Specified torque toolsUse each joint’s source specification.
Square and measuring toolsReuse the frame tools.
Independent carriage supportRequired during assembly; the ball screw can backdrive.

Manufacturer instructions

Lift layout

The fixed mast carries two guides. The 20 mm-lead screw moves the carriage and both arms. Blue highlights the parts in each view; most fasteners are hidden. These show the current CAD, not installation trajectories.

Mast and steel cradle with two guide rails and four guide blocks highlighted.
Mast, cradle and guides
Ball screw, bearing supports, carriage and arm crossbeam in their installed positions.
Screw, carriage and arm beam
Kraken below the mast, driving the REV stack and coupling into the lower screw support.
Kraken → brake → 3:1 cartridge → coupling → screw
Carriage on four guide blocks, with the stock support bracket and horizontal arm beam.
Carriage and stock arm support

Lift travel

Lift position
MK1 with the carriage 335 mm above its lower CAD position; both arms remain folded.
335 mm above the lower CAD position. The frame and mast stay fixed.

Three positions from the coupled CAD export, spanning 565 mm. Both arms stay in their parked pose. These are geometry views; controller limits and stopping distance still need commissioning.

Access and alignment

Use the final fabrication drawings. Stop mounts, adapter details and some joint torques remain unfinished; see design status.

LocationAssembly note
Mast endsInsert 19 HNTT8-5 nuts per rail before closing the ends. Each rail uses 19 M5 × 20 screws, without washers under the recessed heads. Reserve four screws and nuts for the switches.
Mast/cradleFit bottom and rear mounting hardware while the frame fasteners remain accessible.
GuidesFollow HIWIN’s alignment procedure on the finished seats. Keep blocks on rails or transfer retainers and running surfaces clean; never tighten a binding carriage into alignment.
BallnutKeep it on the screw. Fit its four M5 × 16 flange screws and allocated washers before attaching the carriage.
Bearing supportsAssemble on the bench using the MISUMI procedure. Keep the screw parallel to the rails; the floating support must not push it sideways.
CarriageEight upper M5 × 50 socket-head screws and eight lower M5 × 45 button-head screws, with allocated washers. These lengths depend on the corrected seats.
REV stackFit the input coupler, motor screws and output-shaft retention screw before closing the stack. Use the final shaft drawing for coupling engagement and specified clamp torque.
Arm beamFit support hardware while the carriage rear is accessible. The arms use eight M6 × 22 screws, existing washers and eight HNTT8-6 nuts.
Unloaded travelSupport the carriage independently. With the drive disconnected, check for binding before adding the arms.

Limits and stops

The two mast-side switch brackets use four M5 × 20 screws, four washers and four HNTT8-5 nuts in total. These are the remaining four fasteners from the 42-piece rail/switch allocation, not an additional purchase. The moving cam uses two M3 × 16 screws and two washers into the carriage. Adjust switch positions in their slots using actual electrical actuation. The CAD now includes lever and roller pivots. Its 12.92-degree lever range represents 3 mm of nominal roller travel from the supplier drawing; it is not an electrical trip setting.

ACE supplied ML3325M and 250-0294 mounting-foot models. The current review uses four custom adapters and an integral carriage striker. The adapter screw rows now match the measured mast slots. Nominal nut seating and screw engagement have been checked. The candidate also clears the parked arms and base at three lift heights. Loaded-joint capacity and finished countersink tolerances remain unfinished; ACE still needs to confirm foot separation and stopping force. Do not manufacture the earlier S33 layout or the current review candidates.

For the adapter candidate, tighten its mast screws before fitting the absorber kit; the feet block two driver paths. This assembly sequence remains provisional.

We sent ACE the rotational-energy calculation and requested sizing over the actual absorber stroke. Peak force and adjustment remain pending. Final switch trip positions depend on the completed stop arrangement. The switch brackets are not mechanical stops.

Mast camera

D435i and printed bracket at the mast end cap, with the bracket extending down the mast face.
Rear of D435i with two M3 screw heads highlighted in blue through the printed bracket.
Attach the camera before closing off rear screw access.
Transparent mast showing the two captive HNTT8-4 nuts behind the camera bracket.
Insert both mast nuts through the open end.
InterfaceHardwareCheck
Camera to printed bracketTwo M3 × 8 socket-head screws; two existing 0.5 mm M3 washersA 5 mm bracket leaves 2.5 mm insertion. Measure the print; maximum camera insertion is 3 mm. Recommended torque: 0.4 Nm.
Bracket to mastTwo M4 × 16 screws; two 0.8 mm washers; two HNTT8-4 nutsNominal screw engagement is 8.7 mm in each 9 mm nut body. CAD excludes thread chamfers and manufacturing tolerances.
USB cableStrain relief at the mastKeep cable loads off the camera connector.

Hardware is allocated in the mast-camera BOM section; both nuts are constrained in CAD and clear the modeled lift parts. Camera insertion and torque limits come from page 139 of the D400 datasheet . These views show installed geometry, with the mast transparent to expose the nuts.

Before powered motion

Check free travel, bearing alignment, fastener engagement and tool access. Then verify limit input states, controller current limits and direction with an unloaded, restrained setup. Brake behavior, stopping distance and loaded motion require physical tests. The CAD travel range is not a controller setting.

Arm motion

The parked arm pose clears the checked lift parts and top panels at the lower, middle and upper carriage positions. The check includes wrist cameras and brackets.

Do not test an arm by sweeping each joint through its full range while the other joints stay parked. The CAD mesh check found these contacts on both arms:

Pose with other joints parkedContact
Joint 4 at its negative limitGripper/fingers contact the support beam; several arm links contact their own base or other links.
Joint 2 at 210 degreesArm links contact their own base and other links.
Parked arm beside a joint-4 endpoint pose where the gripper folds into the arm base and support beam.

Commissioning needs coordinated, clearance-checked arm poses. The supplier joint limits alone do not prevent these contacts. The check covered 32 joint-endpoint poses and the parked pose at three lift heights; it does not cover continuous trajectories, cables or every base component.